Installation

Home / Installation

DSF ICF Installation

DSF Installation


The DSF ICF system uses 1’ x 8’ planks of Foam-Control EPS with Perform Guard joined by a Diamond Snap-Tie connector every 12” both horizontally and vertically. The Diamond Snap-Tie connector creates a cavity for the concrete between two faces of 2” high-density Foam-Control EPS with Perform Guard. The DSF ICF system remains in place after the concrete is poured, serving as wall, insulation, and attachment base for facing material. Floor and roof assemblies are connected to the wall similar to any poured concrete wall.

For a detailed installations guidelines, please download the DSF Installation Guidelines Brochure.

  DSF ICF Guidelines Brochure